10:12. O/D switch

Check

PERFORMANCE ORDER
1. Include ignition.
2. Make sure that the O/D OFF indicator is not highlighted. Press the O/D OFF switch and be convinced that the O/D OFF indicator is highlighted.
3. If the indicator does not work properly, continue check.

Check of tension

PERFORMANCE ORDER
1. Remove the central console.
2. Include ignition.
3. Measure tension on contacts of the C269 socket of the O/D switch.

Position of the switch
Contacts of the socket
1
2
Normal, In
In +
0
Pressed, In
0
0

In +: Tension of the rechargeable battery

4. If tension on contacts of the socket of the switch differs from demanded, a provorta conductivity in the O/D switch

Conductivity check

PERFORMANCE ORDER
1. Disconnect a wire from the negative plug of the rechargeable battery.
2. Disconnect the socket from the O/D switch.

3. Check conductivity of the O/D switch on contacts of the C269 socket.

Position of the switch
Contacts of the socket
 
1
4
Normal
are opened
Pressed
are closed
4. Otherwise replace the selector lever handle.
5. If the switch works normally, check the electric chain going to the control unit of the transmission.
6. Connect the O/D switch socket.
7. Install the central console.
8. Connect a wire to the negative plug of the rechargeable battery.

Dismantling

PERFORMANCE ORDER
1. Disconnect a wire from the negative plug of the rechargeable battery.
2. Remove the central console.
3. Turn out four screws of fastening of the selector
4. Lift the selector block, disconnect the socket and remove O/D switch plugs.
5. Remove the block of the selector and remove an indicator lamp.
6. Remove the socket from the indicator lamp block.
7. Turn out two screws of fastening of the handle of the selector.
8. Remove the selector handle.
9. Remove the selector handle plug.
10. Remove the selector, the panel and the socket.
11. The screw-driver with a flat edge release contacts of the socket.
12. Take contacts from the socket.
13. Take wires via the panel and the plug.

Assembly

PERFORMANCE ORDER
1. Insert wires via the panel and the plug.
2. Come into contacts in the socket.
3. Install the panel.
4. Install the plug on the selector lever.
5. Adjust the provision of wires so that the handle of the selector could be installed into place.

Prevention

Wires have to undergo deepening in the selector handle.


6. Screw two screws of fastening of the handle of the selector.
7. Establish a lamp.
8. Connect the socket.
9. Screw four screws of fastening of the panel.