9.17. Gear shifting mechanism

Gear shifting mechanism

1 – gear shifting lever handle;
2 – a box for storage of small objects;
3 – ashtray;
4 – forward section of the central console;
5 – gear shifting lever cover;
6 – lighter socket;
7 – central console;
8 – plate of protection of the engine;
9 – catalytic converter;
10 – nuts;
11 – bolt;
12 – clip;
13 – nuts;

14 – bolt;
15 – draft of gear shifting;
16 – nuts;
17 – washer;
18 – pipe;
19 – plug;
20 – plug;
27 – gear shifting lever;
28 – cover;
29 – holder;
30 – lower nest of a spherical support;
31 – draft of the choice of transfers

Repair

PERFORMANCE ORDER
1. You carry out dismantling to the sequences, designated by figures in the drawing.
2. Check a condition of all details and, if necessary, replace them.
3. Assembly is carried out to the sequences of the return to removal.
4. Removal and installation of separate details it is given below.

Installation of a spring

PERFORMANCE ORDER
Make sure that the end of a spring with a hook is established properly in deepening of an arm, as shown in the drawing.