9.8. Dismantling, check and assembly of the fifth / reverse gear and back cover of TE DOHC
Fifth / reverse gear and back cover of TE DOHC
1 – back cover; 2 – lock-nut; 3 – coupling of the synchronizer of the reverse gear; 4 – conical plug of the reverse gear; 5 – the blocking synchronizer ring; 6 – expansion plug; 7 – fork 5-oy/reverse gear; 8 – synchronizer 5-oy/of the reverse gear; 9 – the blocking ring of the synchronizer of the 5th transfer; 10 – leading gear wheel of the 5th transfer; 11 – plug of a gear wheel of the 5th transfer; 12 – the conducted gear wheel of the 5th transfer; 13 – bolt; 14 – bolt; 15 – clamp stopper, spring and steel ball; 16 – backing lamp switch; 17 – transmission case; 18 – magnet; 19 – intermediate shaft of transfer of a backing; 20 – intermediate gear wheel of transfer of a backing; 21 – switching rod 3-ey/the 4th transfers; 22 – switching rod lever 5-oy/back transfers;
|
23 – pin; 24 – switching lever shaft; 25 – switching lever assembled; 26 – forks and rod of switching; 27 – ball clamp; 28 – spring; 29 – main shaft; 30 – secondary shaft; 31 – differential; 32 – coupling case; 33 – clamp cracker spring; 34 – the sliding synchronizer coupling; 35 – clamp cracker; 36 – synchronizer coupling nave; 37 – switching fork 3-ey/the 4th transfers; 38 – plug; 39 – control lever; 40 – switching fork 1-oy/the 2nd transfers; 41 – rod; 42 – rod lever
|
Repair
PERFORMANCE ORDER |
1. You carry out dismantling to the sequences, designated by figures in the drawing. |
2. Check a condition of all details and, if necessary, replace them. |
3. Assembly is carried out to the sequences of the return to removal. |
4. Removal and installation of separate details and knots it is given below. |
|
Check of a side play of a gear wheel of the 5th transfer
PERFORMANCE ORDER |
|
1. Measure by the indicator of hour type a side play of a gear wheel of the 5th transfer. Nominal side play: 0,10–0,22 mm
Maximum permissible side play: 0,27 mm
|
2. If the side play exceeds maximum permissible value, check the surfaces of contact of a gear wheel of the 5th transfer and tighten the plug. If necessary, replace the worn-out and damaged details. |
|
Otvorachivany lock-nuts
PERFORMANCE ORDER |
1. Install the transmission at the OK130 990 007 stand with OK130175011A adapter. |
 |
2. OK201 323 021 adaptation block a main shaft of the transmission. |
3. At the same time include gear wheels of the 1st and 2nd transfer in order that the main shaft of the transmission was not turned. |
4. Unbend fillets of the plate fixing a lock-nut. |
5. Turn off lock-nuts from primary and secondary shaft. |
|
Removal of forks and rod of gear shifting
PERFORMANCE ORDER |
1. Combine the ends of the plug with a control lever (shooter). Turn a rod counterclockwise. |
 |
2. One hand hold forks 1-oy/the 2nd transfers, the second - a fork 3-ey/the 4th transfers and lift them, at the same time moving synchronizers. |
3. Lift a rod and remove a ball clamp, at the same time removing a rod from a coupling case. |
 |
4. Separate forks and rods from synchronizers. |
|
Installation of primary and secondary shaft
PERFORMANCE ORDER |
 |
Establish primary and secondary shaft in a coupling case as it is shown in the drawing. |
|
Installation of forks and rod of gear shifting
PERFORMANCE ORDER |
 |
1. Establish a fork and a rod of gear shifting to a gear wheel of the 2nd transfer as it is shown in the drawing. |
2. Establish a nest of a spring and a spring in a backing lever shaft, then establish a ball clamp and a flat washer. |
 |
3. Establish a rod lever end face opposite to a ring and insert a rod so that the ball clamp entered a shaft. It will expose to one line a core with a rod and will combine with a coupling case opening. |
4. Install synchronizers in neutral situation, and from above insert rods so that the ball clamp entered average deepening. |
 |
5. Press a ball so that it accurately entered average deepening. |
|
Installation of the lever of a rod and rod 5-oy/back transfers
PERFORMANCE ORDER |
|
Install the lever of a rod (1) and a rod 5-oy/back transfers (2) and fix by a bolt. Inhaling moment: 11,8–13,7 N • m
|
|
Installation of an intermediate shaft and gear wheel of a backing
PERFORMANCE ORDER |
1. Establish a gear wheel of a backing and an intermediate shaft of a gear wheel of a backing. |
2. Establish a magnet on a coupling case. |
|
3. Combine the end of the plug of the lock with a control lever and with an opening under a bolt of fastening of an intermediate shaft in the direction shown in the drawing. |
|
Installation of a case of the transmission
PERFORMANCE ORDER |
Apply a thin film of sealant on the interfaced surfaces of a case of coupling and a case of the transmission, establish a case of the transmission and fix by bolts.
Inhaling moment: 38-51H • m
|
|
Installation of the conducted gear wheel of the 5th transfer
PERFORMANCE ORDER |
|
Establish the conducted gear wheel of the 5th transfer as it is shown in the drawing. |
|
Installation of the synchronizer and fork 5-oy/back transfers
PERFORMANCE ORDER |
 |
Install together the synchronizer and a fork 5-oy/back transfers. |
|
Tightening of lock-nuts
PERFORMANCE ORDER |
1. At the same time include gear wheels of the 1st and 2nd transfer in order that the main shaft of the transmission was not turned. |
2. OK201 323 021 adaptation block a main shaft of the transmission. |
Prevention
At installation use a new lock-nut.
|
3. Tighten a lock-nut and for fixing it from an otvorachivaniye bend fillets of the plate fixing a lock-nut
Inhaling moment: 128-196 N of m
|
 |
4. Measure by the indicator of hour type a side play of a gear wheel of the 5th transfer and the conical plug of a backing.
Nominal side play: 0,10–0,22 mm Maximum permissible side play: 0,27 mm
|
|